When we last talked, we had a big gaping hole in our guest bathroom where the cracked acrylic tub/shower surround one was.

With a Steve getting the dust out with a Shop Vac.

Since then, we've made an even bigger mess, but we are moving forward with this project!!  Our first step was to insulate the pipe that provides water to the icemaker in our fridge.  We hoped that this would minimize mold regrowth, since it appears that condensation on this pipe may have contributed to the mold we found when we took out the tub/shower.

When I say "we" insulated the pipe, obviously I mean Steve insulated the pipe.

Next came batt insulation, to cut down on noise coming from the bathroom to our hallway and kitchen.  We were very happy to come by this for free- my parents had an extra roll stored in their barn that they donated to us.  Once all the insulation was in, we installed greenboard drywall.  Normally we would have just plunked the tub in, but because of the odd dimensions of the surround we removed, our tub was about half an inch narrower than the space between where our vinyl flooring ended and the far wall.  The greenboard is meant for damp areas (like bathrooms), so we used that to add the half inch thickness we needed for the tub to be secured against the studs without leaving a big gap between the outer tub edge and our vinyl flooring.

Steve and this framing hammer have grown very close over the last week or so.

We knew we'd run into one area of difficulty with the greenboard, courtesy of whoever plumbed this joint:

Yes, that's an outie.

Obviously the plumber wasn't very well versed in belly buttons.  The studs clearly allow for an innie, but this joint is an outie.  Steve cut away a small section of greenboard, and then used this tricky contraption to lever it up and into place so he could nail it to the studs without disturbing the outie pipe joint while I stood around and took pictures.

GENIUS.

Once he was done installing the greenboard, up went the stringer for the long edge of the tub to rest on, and then we were done for the night.

Strung.  Oh, and see the joint sticking out of the notch in the greenboard?

All that work and there's not even a tub in there yet!!  This is always the point at which I wonder to myself "What have we done??" so I'm trying to remind myself that it gets worse before it gets better.  And remind myself about why we chose to DIY this project in the first place.